Hindustan Construction Company Ltd
HCC | 500185
₹22.37
-0.58 (-2.53%)
Performance
Historical price movement and trading activity
Trading Data
Overview
Hindustan Construction Company Limited (HCC) is a spearheading force in engineering construction, both in India and the Rest of the World (RoW). Seth Walchand Hirachand founded the Company and it was incorporated on January 27, 1926. Presently, the Company is engaged in engineering and construction of large infrastructure projects. The Company's core business primarily comprises Engineering and Construction (E&C) services for large projects across sectors like Power (Hydro, Nuclear, Thermal), Transportation (Roads, Bridges, Metros, Ports), Water (Irrigation and Water Supply) and Industrial projects. Walchand Tandur Cement Company Ltd., Hyderabad became a subsidiary of the Company with effect from 11th October of the year 1967. The Ganga Bridge Construction Co. Ltd became subsidiary of the company in 30th March of the year 1976. During the year 1986, HCC entered into foreign consultancy agreements with Pullman Power Products International Corporation, U.S.A and Interform, Sweden for its Trombay chimney works. The Company renewed the technical collaboration agreement with Taisei Corporation of Japan in the year 1987 for execution of the underground tunnel work for Metro railway project in Calcutta. It entered into a foreign consultancy agreement with Geoconsult of Austria for the Company's tender for construction of tunnel between Sewri and Futka Tank in Mumbai for BMC and with Bureau BBR International Ltd., Zurich in Switzerland, for the company's tender for superstructure design and construction of Godavari Bridge III in AP. The Company entered into a joint venture with M/s. Impregilo-Italy in the year 1991 and submitted tender bid for Nathpa Thakri hydel project in Himachal Pradesh. At the same time, the contract for road construction works in the State of Malavi was terminated. The Company signed a joint venture with Alfred McAlpine International Ltd., U.K. in the year 1994. During the year 1997, The Company signed a Memorandum of Understanding with M/s. Bechtel Water Technology U.K., M/s. Hyundai Engineering & Construction group, Korea, Sam Sung Corporation, Seoul, Korea and M/s. PATI SDN BHD, Malaysia for participating in Water Supply Projects, Bridge Highway and Hydro-Electric Projects respectively. During the year 1999, the company made numerous joint ventures for its differentiated works. In the year 2000, HCC floated an information technology subsidiary, under the name of NCC Infotech Ltd. The Company bagged a contract from Delhi Metro Rail Corporation Ltd., New Delhi in the year 2001 for the construction of Delhi Metro Rail Corridor, Package MC-1A. After a year, in 2003, HCC secured Rs.912.3 million contract from Maharashtra State Road Development Corporation Ltd for construction of 4 laning of Satara-Kolhapur Maharashtra. During the year 2004, HCC got Rs 843 crore order for lifting water from Godavari River using a single pipeline to fill the tanks at Bhimghanpur, Ramappa, Salivagu, Nagaram, Dharmasagar and Ghanpur railway station in Andhra Pradesh, bagged an order from the National Highways Authority of India to execute a project involving four-laning of a 77 km stretch of highway in the Chandikhole-Paradip section in Orissa and also awarded an order of Rs 121 crore for the supply of spiral welded pipes to PSL Ltd. to carry out the Godavari Lift Irrigation Scheme project for Government of Andhra Pradesh. The Company secured its first BOT Project in the year 2005; it was worth of Rs 302 million from the office of an Executive Engineer, Integrated Unit of PWD. In 2005, HCC awarded 2 contracts of the Lucknow-Muzaffarpur National Highway project. The contracts are jointly valued at Rs. 410.40 crore and awarded by the National Highway Authority of India. As at September 2006, HCC bagged two prestigious Hydel project contracts from NHPC worth Rs.794crores. It has bagged the Chutak Hydroelectric Project for Rs. 410.54 crores and Nimo Bazgo Hydel project for Rs.383.90 crores both in Jammu and Kashmir. The Company received Golden Peacock National Quality Award for the Year 2006 in the category for Private Large Service by IOD (Institute of Directors) in association with World Environment Foundation (WEF) and also Golden Peacock Award for Occupational Health & Safety - 2007 from IOD in association with WEF. During December of the year 2007, HCC received a prestigious contract worth Rs. 297.51 crore in a joint venture with Alpine Mayreder, Austria from Delhi Metro Rail Corporation (DMRC). HCC incorporated a Special Purpose Vehicle (SPV) company in January of the year 2008 that is HCC Singapore Enterprises Pte, as a wholly owned subsidiary of the company for promoting its business and also the business of group companies. Further its wholly owned Subsidiary; HCC Real Estate has also incorporated a Special Purpose Vehicle (SPV) company that is Charosa Wineries for undertaking wine business. In May of the year 2008, HCC joined 18 other companies in an unprecedented statement to the 'Group of Eight' countries, urging heads of state and government to take action on the emerging global crisis in water and sanitation. During July of the year 2008, HCC bagged the prestigious order from National Highway Authority of India (NHAI) to construct the 4.4 km elevated highway at Badarpur on National Highway 2 (Mathura Road) near Delhi on BOT basis. Company formed a separate wholly owned subsidiary i.e. HCC Infrastructure Ltd in FY 2007-08 to develop infrastructure projects in areas such as transport, power, water, urban infrastructure projects on private public partnership basis. In March 2010, the Company acquired controlling stake i.e. 66% equity stake in Karl Steiner AG, Switzerland (KSAG), the second largest services contractor in Swiss Real Estate market. During the year 2018-19, Charosa Wineries ceased to be a subsidiary of company w.e.f. February 08, 2019. The 330 MW Kishanganga hydro-electric project (HEP) in J&K and the 110 MW Pare HEP in Arunachal Pradesh were commissioned during 2019. The Company commissioned the TBM for tunnel boring of its Head Race Tunnel (HRT) at Vishnugad Pipalkoti HEP, during 2020. During the year 2022, pursuant to the Securities Purchase Agreement entered between Xander Investment Holding XXVI Limited and the Company along with certain group entities, Xander's shareholding (14.55%) in HCC Concessions Limited (HCON), subsidiary of the Company, has been bought back by HCON. Consequent to the buy back, effective 20 August 2021, HCON (including its subsidiaries i.e. Narmada Bridge Tollways Limited, Badarpur Faridabad Tollways Limited, Baharampore-Farakka Highways Limited, Raiganj-Dalkhola Highways Limited) has ceased to be joint ventures and became subsidiaries of the Company. The Company completed the sale of Baharampore-Farakka Highways Limited (BFHL) to Cube Highways and Infrastructure V Pte Ltd on March 28, 2023. In 2024, the 118 MW Nikachhu Hydro Power Project in Bhutan has been completed effective from 9 March, 2024. The final milestone of wet commissioning of turbines was achieved on 14 December, 2023, which began commercial operation of Unit-II from 25 January 2024 and Unit-I from 8 February 2024, respectively. The Numaligarh Jorhat Road Project (NJRP) in Assam accomplished the 4th milestone of 100% physical completion of the 39.72 km Numaligarh Jorhat Section of the project on February 29, 2024. The Sawalkote Road Tunnel was inaugurated on August 27, 2023. Parwan Dam in Rajasthan was completed. The Rajasthan Atomic Power Project Units 7 & 8 also got completed. The Company divested its entire equity shareholding in HCC Real Estate Ltd (HREL), wholly owned subsidiary of the Company, in March 2024. Accordingly, HREL and its subsidiaries - Nashik Township Developers Ltd, Powai Real Estate Developers Ltd, HCC Aviation Ltd, and HCC Realty Ltd have ceased to be subsidiaries of the Company. During the year 2025, HCC marked several notable milestones, underscoring its execution capabilities across diverse and complex infrastructure segments. The Company received completion certificates for five major projects: the Rajasthan Atomic Power Project - Units 7 & 8, the Integrated Nuclear Recycle Plant (INRP) of BARC at Tarapur, the Anji Khad Cable Stayed Bridge in Jammu and Kashmir's Reasi district on June 6, 2025. The first section of the 112.32 km Delhi Metro Phase 4 project was established on January 5, 2025. The T49A tunnel in Jammu & Kashmir, and the DC06 package of the Delhi Metro. In a significant development for urban transit, trial runs for Phase 2 of the Mumbai Metro Line 3 commenced in February, 2025. In April 2025, HCC synchronized Unit 6 (250 MW) of the Tehri Pumped Storage Project (4x250 MW) in Uttarakhand, strengthening its credentials in hydropower. Additionally, the Company contributed to a landmark moment in Mumbai's urban infrastructure with the inauguration of the Mumbai Coastal Road project. The Vishnugad Pipalkoti Hydropower Project completed 5.8 km of TBM tunnelling out of a total 12.1 km. The tunnel work for the Parwan Gravity Dam Project in Rajasthan was completed in FY25. HCC launched the all 624 U-girders for Chennai Metro Line 4's Package ECV02 on March 15, 2025, for the 7.945 km elevated corridor of Chennai Metro Line 4's Package ECV-02. The northbound Bow Arch String Girder' bridge, which connects the Mumbai Coastal Road to the Bandra Worli Sea Link was established on January 26, 2025. The launch, along with three major interchanges enhanced connectivity to key areas such as Worli, Prabhadevi, Lower Parel, and Lotus Junction.
Sector & Industry
Infrastructure Developers & Operators - Construction - Civil / Turnkey - Large
Listing Exchange
National Stock Exchange (NSE)
Bombay Stock Exchange (BSE)
Fundamentals
Financial strength and ownership structure
Valuation & Ratios
Financial Performance
Shareholding Pattern
Technicals
Price-based indicators and levels
Indicators
Index (RSI)+38.49Neutral
Support and Resistance Levels
Moving Averages
News
Hot Pursuit
Hindustan Construction rises after securing Rs 127 crore civil works contract in Bhutan
5 Jun 2026
Hindustan Construction Company added 1.33% to Rs 24.30 after the company secured a contract worth Rs 127 crore from Wangchhu Hydroelectric Power (WHPL), Bhutan, for construction works related to the Wangchhu Hydroelectric Project.
The scope of work includes construction of diversion tunnels, hydromechanical gates and cofferdams. The contract is scheduled to be completed within nine months. The award follows WHPL's technical and financial evaluation process and reflects HCC's proven expertise in executing complex hydroelectric projects in challenging geographies. The diversion works are critical for enabling the early commencement of the project's primary civil works and maintaining the overall implementation schedule of the Wangchhu Hydroelectric Project. Bhutan's hydropower sector is poised for significant expansion under the country's 13th Five-Year Plan (2024-29), with the government targeting 6,000 MW of installed capacity and continued investments in large hydroelectric projects. HCC's continued presence in Bhutan for over three decades has contributed significantly to the country's hydropower capacity through projects such as Tala (1020 MW), Kurichu (60 MW), Punatsangchhu-1 (1200 MW), Dagachhu (114 MW) and Nikachhu (118 MW). Hindustan Construction Company (HCC) is the flagship company of Hindustan Construction Company Group (HCC Group) and is involved in engineering and construction of infrastructure projects such as dams, tunnels, bridges, hydro, nuclear and thermal power plants, expressways and roads, marine works, water supply, irrigation systems and industrial buildings across the country. The company had reported 34.57% fall in consolidated net profit to Rs 58.94 crore on a 27.77% fall in revenue to Rs 992.20 crore in Q4 FY26 over Q4 FY25. Powered by Capital Market - Live News
HCC wins Rs 2,917-cr CIDCO contract for water tunnel
24 Apr 2026
Hindustan Construction Company (HCC) said that it has secured a significant infrastructure contract worth Rs 2,917 crore from the City and Industrial Development Corporation of Maharashtra (CIDCO).
The order is for the construction of a 22.21 km raw water tunnel and a 250 MLD water treatment plant in Raigad. The project has been awarded to the LCESPL'HCC joint venture, with HCC's execution share valued at around Rs 1,100 crore. The scope of work includes the design and construction of a 22.21 km tunnel using tunnel boring machine (TBM) technology to transport water from Kondhane Dam in Karjat to a proposed water treatment plant at Mohope in Panvel. It also involves the design, build, supply, erection, testing and commissioning of the 250 MLD water treatment facility. In addition, the contract includes 15 years of comprehensive operations and maintenance under a design, build and operate (DBO) model. The project is part of CIDCO's plan to strengthen long-term water infrastructure for Navi Mumbai and adjoining regions, aimed at supporting rising urban and industrial water demand. Hindustan Construction Company (HCC) is the flagship company of Hindustan Construction Company Group (HCC Group) and is involved in engineering and construction of infrastructure projects such as dams, tunnels, bridges, hydro, nuclear and thermal power plants, expressways and roads, marine works, water supply, irrigation systems and industrial buildings across the country. The company reported consolidated net loss of Rs 22.42 crore in Q3 FY26 as against net loss of Rs 255.56 crore in Q3 FY26. Revenue from operations fell 8.1% to Rs 925.32 crore in Q3 FY26 as against Rs 1,006.81 crore in Q3 FY25. Shares of Hindustan Construction Company fell 2.67% to Rs 20.05 on the BSE.
HCC secures Rs 1,662-cr Goregaon-Mulund link road phase IV contract
19 Mar 2026
Hindustan Construction Company has won a major infrastructure contract valued at approximately Rs 1,662.27 crore from the Brihanmumbai Municipal Corporation for the construction of the Goregaon-Mulund Link Road (GMLR) Phase IV.
The project will be executed by the Aakshya-HCC Joint Venture, where HCC holds a 49% stake. The contract covers construction of a second-level flyover and free-left at-grade movements in Phase I, including a 1,330-metre flyover, 3,200-metre at-grade road, and 2,620-metre free-left at grade. Phase II includes a cloverleaf interchange and free-left bypasses at grade, spanning 2,400 metres for the cloverleaf loop and 3,600 metres for free-left bypasses. The project also entails a 180-metre cable-stayed span and ramps totaling 270 metres. The GMLR Phase IV project is part of BMC's broader plan to improve east-west connectivity across Mumbai, enhancing traffic flow and reducing congestion in the corridor. HCC said the order reinforces its position in executing complex urban infrastructure projects in India, combining elevated flyovers, at-grade roads, and advanced interchange designs. Hindustan Construction Company (HCC) is the flagship company of Hindustan Construction Company Group (HCC Group) and is involved in engineering and construction of infrastructure projects such as dams, tunnels, bridges, hydro, nuclear and thermal power plants, expressways and roads, marine works, water supply, irrigation systems and industrial buildings across the country. The company reported consolidated net loss of Rs 22.42 crore in Q3 FY26 as against net loss of Rs 255.56 crore in Q3 FY26. Revenue from operations fell 8.1% to Rs 925.32 crore in Q3 FY26 as against Rs 1,006.81 crore in Q3 FY25. Shares of Hindustan Construction Company shed 0.13% to trade at Rs 15.64 on the BSE. Powered by Capital Market - Live News
Corporate News
Hindustan Construction secures Rs 127-cr Wangchhu Hydroelectric project
5 Jun 2026
Hindustan Construction Company (HCC) secured a contract worth Rs 127 crore from Wangchhu Hydroelectric Power (WHPL), Bhutan, for construction works related to the Wangchhu Hydroelectric Project. The scope of work includes construction of diversion tunnels, hydromechanical gates and cofferdams. The contract is scheduled to be completed within nine months. The award follows WHPL's technical and financial evaluation process and reflects HCC's proven expertise in executing complex hydroelectric projects in challenging geographies. The diversion works are critical for enabling the early commencement of the project's primary civil works and maintaining the overall implementation schedule of the Wangchhu Hydroelectric Project. Bhutan's hydropower sector is poised for significant expansion under the country's 13th Five-Year Plan (2024-29), with the government targeting 6,000 MW of installed capacity and continued investments in large hydroelectric projects. HCC's continued presence in Bhutan for over three decades has contributed significantly to the country's hydropower capacity through projects such as Tala (1020 MW), Kurichu (60 MW), Punatsangchhu-1 ( 1200 MW), Dagachhu ( 114 MW) and Nikachhu ( 118 MW).
Hindustan Construction Company to announce Quarterly Result
8 May 2026
On 14 May 2026
Hindustan Construction Company will hold a meeting of the Board of Directors of the Company on 14 May 2026.
Hindustan Construction bags CIDCO project of Rs 1,100 cr
24 Apr 2026
Hindustan Construction Company (HCC) secured a significant infrastructure contract valued at approximately ~2.917.6 crore from City and Industrial Development Corporation of Maharashtra (CIDCO) for the construction of a 22.21 km raw water tunnel and a 250 MLD water treatment plant in Raigad. The project has been awarded to the LCESPL-HCC Joint Venture, in which HCC is responsible for executing works worth approximately Rs 1,100 crore. The project involves the design and construction of a 22.21 km long raw water tunnel using Tunnel Boring Machine (TBM) technology, conveying water from Kondhane Dam at Village Chochi in Karjat to a proposed 250 MLD Water Treatment Plant (WTP) at Village Mohope in Pan vel. The scope of work also includes the design, build, supply, erection, testing and commissioning of the water treatment plant, along with 15 years of comprehensive operation and maintenance under a Design, Build and Operate (DBO) contract model.
Hindustan Construction Company to conduct board meeting
4 Feb 2026
On 12 February 2026
Hindustan Construction Company will hold a meeting of the Board of Directors of the Company on 12 February 2026. Powered by Capital Market - Live News
Results - Announcements
Hindustan Construction Company consolidated net profit declines 34.57% in the March 2026 quarter
15 May 2026
Sales decline 27.77% to Rs 992.20 crore
Net profit of Hindustan Construction Company declined 34.57% to Rs 58.94 crore in the quarter ended March 2026 as against Rs 90.08 crore during the previous quarter ended March 2025. Sales declined 27.77% to Rs 992.20 crore in the quarter ended March 2026 as against Rs 1373.70 crore during the previous quarter ended March 2025. For the full year,net profit rose 46.96% to Rs 165.52 crore in the year ended March 2026 as against Rs 112.63 crore during the previous year ended March 2025. Sales declined 29.16% to Rs 3969.59 crore in the year ended March 2026 as against Rs 5603.37 crore during the previous year ended March 2025. Particulars Quarter Ended Year Ended Mar. 2026 Mar. 2025 % Var. Mar. 2026 Mar. 2025 % Var. Sales 992.20 1373.70 -28 3969.59 5603.37 -29 OPM % 17.21 21.00 - 14.24 11.31 - PBDT 97.14 195.59 -50 212.65 157.49 35 PBT 91.96 173.25 -47 185.16 -6.49 LP NP 58.94 90.08 -35 165.52 112.63 47 Powered by Capital Market - Live News
Hindustan Construction Company reports consolidated net profit of Rs 8.07 crore in the December 2025 quarter
13 Feb 2026
Sales decline 8.09% to Rs 925.32 crore
Net profit of Hindustan Construction Company reported to Rs 8.07 crore in the quarter ended December 2025 as against net loss of Rs 38.92 crore during the previous quarter ended December 2024. Sales declined 8.09% to Rs 925.32 crore in the quarter ended December 2025 as against Rs 1006.81 crore during the previous quarter ended December 2024. Particulars Quarter Ended Dec. 2025 Dec. 2024 % Var. Sales 925.32 1006.81 -8 OPM % 7.26 -8.22 - PBDT -17.52 -206.48 92 PBT -22.42 -296.00 92 NP 8.07 -38.92 LP Powered by Capital Market - Live News