URL copied to clipboard

Trending News

Aprameya Engineering IPO Ended with Stellar 179.08x Subscription on Day 3!

Aprameya Engineering IPO saw massive demand, subscribed 179.08 times by Day 3, reflecting high investor confidence in the company's growth prospects and industry position.
Aprameya Engineering IPO Ended with Stellar 179.08x Subscription on Day 3!

Aprameya Engineering IPO witnessed tremendous interest, achieving a subscription rate of 179.08 times by Day 3. This impressive response highlights strong investor confidence and enthusiasm for the company’s growth prospects and its standing in the industry.

Aprameya Engineering Limited IPO Subscription Status

Steps to check Aprameya Engineering Limited IPO subscription status on NSE

Following are the steps to check it through the NSE website

  • Visit NSE‘s official website.
  • Navigate to the ‘Market Data’ tab.
  • Choose ‘IPO’.
  • Select the ‘Aprameya Engineering Limited IPO’ to check its subscription status.
  • Opt for either NSE Bid details or Consolidated Bid details.
  • Explore the total number of bids received from various investors. 

Aprameya Engineering IPO Allotment Status

The allotment date for the Aprameya Engineering IPO is set for July 30, 2024, with shares priced at a range of ₹56 to ₹58  per share and a face value of ₹ 10. The offering consists of lots of 2000 shares, with bids accepted for these lots or their multiples.  

Aprameya Engineering IPO Subscription Status

Aprameya Engineering IPO continued to draw interest on Day 2, being subscribed 5.50  times. This robust uptake highlights ongoing investor enthusiasm and confidence in the company’s potential within the Engineering sector.

Aprameya Engineering Limited IPO Listing Date 

Aprameya Engineering IPO is expected to be listed on the NSE SME on August 1, 2024. 

Loading
Read More News
ग्रीन एनर्जी स्टॉक में 4.5% की बढ़ोतरी, Jindal Renewables के साथ ग्रीन स्टील के लिए साझेदारी बढ़ाने के बाद।

ग्रीन एनर्जी स्टॉक में 4.5% की बढ़त, Jindal Renewables के साथ ग्रीन स्टील उत्पादन के लिए साझेदारी विस्तार के बाद।

ग्रीन एनर्जी कंपनी ने Jindal Renewables के साथ साझेदारी बढ़ाकर कर्नाटका के koppal क्षेत्र में 302.4 MW पवन ऊर्जा परियोजना