Aliceblue ANT
Aliceblue ANTInstall and trade smarter everywhere
NMDC Ltd

NMDC Ltd

NSE: NMDC | BSE: 526371
82.4-2.20 (-2.60%)
Trade now

    Performance

    Historical price movement and trading activity

    Trading Data

    Today's High

    83.79

    Today's Low

    82.25

    Open

    83.79

    Previous Close

    82.4

    Volume

    9234255

    Total Traded Value High

    764228794.12

    Overview

    Mining & Mineral products - Mining / MineralsNSE / BSE

    NMDC Limited., a prestigious Navratna Public Sector Enterprise (PSE) under the Ministry of Steel, Govt. of India, stands tall as the nation's foremost producer of iron ore. With highly advanced and mechanized iron ore mines in Chhattisgarh and Karnataka, NMDC holds the position of a global leader in cost effective iron ore production. Adding to its repertoire, the Company operates the sole mechanized diamond mine in India, nestled in the exquisite landscape of Panna, Madhya Pradesh. At present, Company is producing about over 40 MTPA of iron ore from its major iron ore producing units i.e. from Bailadila Sector in Chhattisgarh and Donimalai in Bellary-Hospet region in Karnataka. NMDC is the largest iron ore producer by volume in India. The Company is engaged in exploration of a range of minerals including iron ore, copper, rock phosphate, lime stone, dolomite, gypsum, bentonite, magnesite, diamond, tin, tungsten, graphite, and beach sands. The company sells most of their high grade iron ore production to the Indian domestic steel market, primarily pursuant to long term sales contracts. They sell their core products, iron ore fines, lump and slimes, through the company's sales and marketing function. NMDC Limited was incorporated on November 15, 1958, as a government company with the name National Mineral Development Corporation Pvt Limited. During the year 1959-60, the name of the company was changed from National Mineral Development Corporation Pvt Limited to National Mineral Development Corporation Limited and further to NMDC Limited on 5 June 2007. In 1966, the company acquired the Panna Diamond Project. In the year 1968, they commenced production of iron ore from Bailadila Deposit No.14. In the year 1977, they commenced production of iron ore from Bailadila Deposit No.5 and Donimalai Iron Ore Mine. Also, they commenced production of iron ore from Bailadila Deposit No.11C in the year 1987. In the year 1989, the company incorporated J & K Mineral Development Corporation Ltd as a joint venture with J & K Minerals Ltd, to explore and exploit the magnesite mine at Panthal and to produce dead burnt magnesite. In the year 1998, the company was conferred with the Mini Ratna status by Department of Public Enterprise, Government of India, which enabled Board of Directors to exercise certain capital expenditure powers without reference to Government of India. In the year 2002, the company commenced production of iron ore from Bailadila Deposit No.10/11A. In the year 2008, the company was accredited as the 'Centre of Excellence' in the field of mineral processing by the Expert Group of United Nations Industrial Development Organisation (UNIDO). They entered into an MoU with Spice Metals and Minerals for the formation of a strategic partnership for planning, acquisition, development and management of metal and mineral projects outside India. During the year, the company was Conferred the Navratna status by Department of Public Enterprise, Government of India which enabled the Board of Directors of the company to exercise certain enhanced capital expenditure powers without reference to Government of India. They incorporated a joint venture 'NMDC-CMDC Limited' with Chhattisgarh Mineral Development Corporation Limited to develop Bailadila iron ore Deposit No. 13. Also, they ventured into new area - Wind Energy and they commissioned seven unit wind electricity generators having the capacity of 1.5 MW. In the year 2009, the company entered into an MoU with Steel Authority of India Limited for the development of the Arki Limestone deposit for the supply of low silica high grade limestone primarily to the steel plants of the company and Steel Authority of India Limited. Also, they entered into an MoU with the Department of Mines & Geology, Government of Jharkhand for carrying out geological exploration in Jharkhand for various minerals like iron ore, lime stone, bauxite etc. During the year 2009-10, Government of India disinvested 8.38% of their holding in the company aggregating 332,243,200 equity shares of the face value of Re.1/- each through an Offer for Sale. In January 2010, the company entered into an MoU with Department of Mines & Geology (DMG), Govt. of Andhra Pradesh and Andhra Pradesh Mineral Development Corporation (APMDC), Govt. of Andhra Pradesh for mineral exploration in the State of Andhra Pradesh. Sponge Iron India Ltd was amalgamated with the company with effect from July 01, 2010 as Sponge Iron Unit. During the year 2010-11, the company signed an MoU with OJSC Severstal, Russia, to jointly set up an Integrated steel plant with an initial capacity of 2 million TPA in Karnataka. The company incorporated a joint venture company, namely Kopano Ke Matla Investment Company (Pty) in the Republic of South Africa for exploring and exploiting the mineral resources in South Africa. In January 29, 2010, the company signed an MoU for joint exploration work for Iron ore in Kadapa, Kurnool, Chittoor and Karimnagar Districts and for Gold in Chittoor and Anantapur districts of A.P. In September 6, 2011, the company signed the contract for Coke oven Package for the upcoming 3 MTPA Integrated Steel Plant at Nagarnar, with the Consortium lead by Bhilai Engineering Corporation (BEC). The total cost of the package is Rs 1978.00 crore. The Coke Oven Plant will be executed within the overall time frame of 33 months. In October 20, 2011, the company signed the share subscription agreement with Legacy Iron Ore Ltd, Australia for holding 50% of the total shares in the capital of Legacy Iron Ore Ltd, Australia, at a price aggregating to AUD 18.89 million. In December 12, 2011, the company incorporated a special purpose vehicle (SPV) company by the name of NMDC Power Ltd for the purpose of setting up a power plant for captive power supply to the 3 MTPA integrated steel plant being constructed at Nagarnar. On 23 May 2012, NMDC signed the contract for Steel Making Shop (SMS) Package for the upcoming 3 MTPA integrated steel plant at Nagarnar, Chhattisgarh with the consortium led by M/s Siemens VAI MT GmbH & Co. (SVAI), Austria. The Board of Directors of NMDC at its meeting held on 8 October 2012 decided to fix iron ore prices for domestic customers on monthly basis from the month of October 2012. On 7 June 2013, NMDC signed Memorandum of Understanding (MoU) with MOSI OA TUNYA DEVELOPMENT COMPANY of Zimbabwe for mineral projects in Zimbabwe. NMDC plans to develop mineral assets overseas to secure raw materials for the steel industry. The designated organization of the Ministry of Tourism and Hospitality Industry, Government of Zimbabwe has invited NMDC as a strategic partner to invest in the exploration and development of the iron ore, coal, Gold and chrome tenements. This MoU will provide exclusivity to NMDC for participation in mineral projects at Zimbabwe. On 21 August 2013, NMDC announced that its wholly owned subsidiary NMDC Power Ltd. (NPL) has signed a Memorandum of Understanding (MoU) with IL&FS Energy Development Company Ltd (IEDCL), a subsidiary of IL&FS Ltd. to set up a 500 megawatt (2x250 MW) thermal power plant under joint venture at Gonda in Uttar Pradesh. On 23 January 2015, NMDC signed contract agreements with Larsen & Toubro Ltd on water packages for NMDC's upcoming 3 MTPA integrated steel plant steel plant at Nagarnar in Chhattisgarh. NMDC started the trial production of its new Project Bailadila Iron Ore Deposit 11B located in Bailadila Region in Dantewada in the State of Chhattisgarh on 29 March 2015. NMDC said at that time that it has completed this project having iron ore production capacity of 7 Million Tonnes Per Annum (MTPA) with an investment decision of over Rs 600 crore. On 29 June 2015, NMDC signed a tripartite MoU with the Union Steel Ministry and the State Government of Jharkhand for setting up of a steel plant at Jharkhand. On 3 November 2015, NMDC unveiled Vision 2025 plan that seeks to reorient its business model and strategize effectively to retain its market leadership in the domestic market and also make a mark on the global mining scene to ensure raw material security for Indian industry. A key point of NMDC's Vision 2025 is the ambitious expansion plan to increase iron ore mining capacity to 75 MTPA by 2018-19 and 100 MTPA by 2021-22. On 24 October 2016, NMDC and Mishra Dhatu Nigam Limited (MIDHANI) signed a MoU for Tungsten Mining & Development of Processing Technology. NMDC being a strong mining company with experience in acquisition of mineral assets abroad and MIDHANI having expertise in metals and alloys providing technical support and coordination for Ammonium Para Tungstate (APT) can combine their complementary strengths to pursue a win-win venture in developing the identified tungsten mineral assets in India and abroad. This alliance would strengthen both NMDC and MIDHANI to explore jointly the Tungsten assets in India and abroad for investment and development of technologies for converting Tungsten ore to APT and Tungsten powder. During financial year 2017-18, the Company commissioned Kumaraswamy Iron Ore Project, and 1.2 MTPA Pellet Plant in Donimalai Complex. Section 1 between Jagdalpur to Silakjhori, a length of 45.5 km of railway line was completed and opened for traffic. Rail line between Jagdalpur to Amagura, a length of 14.3 km of railway line was completed and opened for traffic. Crushing Plant of Dep.14 & 11/C and Downhill conveyor, additional screening lines in Bacheli & Kirandul, Rapid Wagon Loading System (RWLS) etc are envisaged. Waste mining and increase in evacuation capacity being a major area of focus for enhancing the life of mines, the schemes like beneficiation plant at Bacheli & Kirandul and Slurry pipeline from Bacheli to Nagarnar was taken up. The rooftop solar power unit at Head office was commissioned and made operative since April 2017. The Mine Transport Surveillance System (MTSS- KHADAN-CHOUKSI) at Donimalai Complex (Donimalai, Kumarswamy and Pellet Plant) was commissioned. In 2018-19, 45.50 kms line between Jagdalpur & Silakjhori, (Section-l) and 7.32 kms line between Dantewada & Gidam (Section-ll) were completed during the FY 2017-18 and opened for traffic. Further, during FY 2018-19, 9.2 Kms line between Silakjhori and Kumharsodra (Section-lll) was completed and opened for traffic. 9.2 Kms line between Silakjhori and Kumharsodra (Section-lll) was completed and opened for traffic. Further, Doubling of KK line between Jagdalpur & Ambagaon (25 km) was taken up. In 2019-20, 1 MW capacity grid connected Roof Top Solar (RTS) power plants were installed and commissioned in the month of July-2019 in various production units of NMDC (Bailadila Iron Ore Mine, Kirandul Complex & Bacheli Complex and Donimalai Iron Ore Mine, Donimalai Complex). The assembly was commissioned on 8 November, 2019. Site levelling works of Ore Processing Plant (OPP) at Bacheli and Pellet Plant at Nagarnar were completed along with soil investigation studies. In FY'20, the Company's overseas project, Legacy completed 500 mts of drilling in Gold/ Nickle tenements in Australia. Geological mapping and Geochemical Mapping completed in 5 potential sub-blocks. NMDC completed Geophysical Surveys in One Block. Topographic Surveys using SP2 60 GNSS completed. Remote Sensing Studies were completed in collaboration with NRSC. Chhattarpur Panna Block 1, Chhattarpur Panna Block 2 and Damoh Block, Panna (5 Prospective Blocks) and Additional 12 Diamond Blocks. Section I Jagdalpur to Silakjhori 45.5 km of railway line was completed & opened for traffic. 48% of the section II between Gidam to Silakjhori (52.73 Kms) was also completed. Site Levelling work for Pellet Plant at Nagarnar & Ore processing plant at Bacheli was almost completed. NMDC has also completed study of Life Cycle Assessment of Iron Ore in FY'20. Donimalai Iron Ore Mine of NMDC Ltd. resumed mining operations since 18.02.2021. Ministry of Steel, Government of India, has sold 21,95,02,378 (7.49%) equity shares @ Rs.165/- per share and raised an aggregate net amount of Rs. 3651.37 crores. The Company commissioned Additional Screening Line & up-gradation of existing conveyor at Kirandul in Jan' 21. 12.2 kms line between Kumharsodra and Kaklur was commissioned during FY 2020-21. In FY 2022-23, the Demerger Scheme of Arrangement between the Company and NMDC Steel Limited (NSL) and their respective Shareholders and Creditors, involving demerger of Company's Iron & Steel Plant Business Undertaking from Demerged Company to the NMDC Steel Limited became effective from 3 October, 2022. NSL Plant commissioned and started production in FY 2023-24. In 2024, Company commenced operations from its Kumar Marenga stockyard and implementing a 10 MTPA Rapid Wagon Loading System at its Kirandul Complex. Another development in 2024 was Company resumed operations at Panna Diamond Mines Project in Madhya Pradesh with the diversification in mineral portfolio. Additionally, Legacy iron ore Limited, Perth Australia, a subsidiary of NMDC started Gold mining at Mt. Celia during FY 2024. In FY 2025, Company commissioned 10.5 MW of wind energy capacity at the Chitradurga facility and installed 1.5 MW of rooftop solar panels across operational units. Rapid Wagon Loading System (RWLSI) at Kirandul Complex got completed and Screening Plant (SP-III) at BIOM Kirandul Complex progressed well in construction activities in FY25. NMDC became the first mining company in India to produce more than 50 million tonnes of iron ore in FY 2026. Tokisud North Coal mine in Jharkhand commenced mining operations in January 2026, by entering into the domestic coal mining. The groundbreaking of Bailadila Iron Ore Deposit-4 was undertaken in February 2026. Ground Breaking for Deposit-4, NCL near Bhansi, Chhattisgarh for iron-ore commenced its mining operations in 2026. The Kirandul-Jagdalpur rail-line doubling project is completed with 128 km, making it operational during the year.

    Fundamentals

    Financial strength and ownership structure

    Valuation & Ratios

    Market Capitalisation

    ₹67,055.19

    Price to Book (PB)

    1.97

    Price to Earnings (PE)

    9.00

    Return on Equity (ROE)

    23.26%

    Earnings Per Share (EPS)

    8.43

    Dividend Yield

    4.59%

    Financial Performance

    4013.98
    5409.90
    6489.31
    5414.19
    4918.91
    6567.83
    7004.59
    6738.86
    6378.11
    7610.79
    11343.13
    6795.25
    Sep
    '23
    Dec
    '23
    Mar
    '24
    Jun
    '24
    Sep
    '24
    Dec
    '24
    Mar
    '25
    Jun
    '25
    Sep
    '25
    Dec
    '25
    Mar
    '26
    Jun
    '26

    Shareholding Pattern

    60.79%
    60.79%
    60.79%
    60.79%
    Sep
    '25
    Dec
    '25
    Mar
    '26
    Jun
    '26

    Technicals

    Price-based indicators and levels

    Indicators

    IndicatorValueSignal
    Relative Strength Index (RSI)+40.86Neutral
    MACD-0.29Bearish

    Support and Resistance Levels

    R387.71
    R286.91
    R185.76
    S183.81
    S283.01
    S381.86

    Moving Averages

    PeriodSMAEMA
    20D Moving Average85.2084.97
    50D Moving Average84.7985.30
    200D Moving Average83.6483.22

    News

    NMDC's iron ore production rose to 4.07 MT in August 2026, up from 3.37 MT

    1 Sept 2026

    NMDC Limited announced provisional production and sales figures for iron ore for the month and period ending August 2026, reporting a total monthly production of 4.07 MT, up from 3.37 MT in August 2025, and cumulative production of 23.23 MT compared to 18.45 MT for the same period last year. Sales for August 2026 reached 3.58 MT, a rise from 3.39 MT in August 2025, with cumulative sales totaling 18.72 MT, up from 18.37 MT in the corresponding period of the previous year. Production from Chhattisgarh totaled 2.64 MT in August 2026 and 16.42 MT cumulatively, while Karnataka contributed 1.43 MT for the month and 6.81 MT cumulatively.

    NMDC Ltd up for five straight sessions

    26 Aug 2026

    NMDC Ltd is quoting at Rs 87.22, up 1.49% on the day as on 12:44 IST on the NSE. The stock is up 26.9% in last one year as compared to a 0.89% fall in NIFTY and a 45.57% fall in the Nifty Metal.

    NMDC Ltd rose for a fifth straight session today. The stock is quoting at Rs 87.22, up 1.49% on the day as on 12:44 IST on the NSE. The benchmark NIFTY is down around 0.21% on the day, quoting at 24283.9. The Sensex is at 77674.38, up 0.02%. NMDC Ltd has added around 4.43% in last one month. Meanwhile, Nifty Metal index of which NMDC Ltd is a constituent, has added around 7.47% in last one month and is currently quoting at 13372.3, up 0.27% on the day. The volume in the stock stood at 69.18 lakh shares today, compared to the daily average of 188.54 lakh shares in last one month. The benchmark September futures contract for the stock is quoting at Rs 87.94, up 1.97% on the day. NMDC Ltd is up 26.9% in last one year as compared to a 0.89% fall in NIFTY and a 45.57% fall in the Nifty Metal index. The PE of the stock is 10.08 based on TTM earnings ending June 26.

    NMDC Ltd spurts 1.54%

    24 Aug 2026

    NMDC Ltd is quoting at Rs 85.91, up 1.54% on the day as on 12:49 IST on the NSE. The stock is up 21.55% in last one year as compared to a 3.13% drop in NIFTY and a 41.29% drop in the Nifty Metal index.

    NMDC Ltd is up for a third straight session in a row. The stock is quoting at Rs 85.91, up 1.54% on the day as on 12:49 IST on the NSE. The benchmark NIFTY is down around 0.28% on the day, quoting at 24185.1. The Sensex is at 77288.04, down 0.33%. NMDC Ltd has risen around 2.86% in last one month. Meanwhile, Nifty Metal index of which NMDC Ltd is a constituent, has risen around 6.87% in last one month and is currently quoting at 13172.6, up 1.22% on the day. The volume in the stock stood at 142 lakh shares today, compared to the daily average of 184.81 lakh shares in last one month. The benchmark August futures contract for the stock is quoting at Rs 86.08, up 1.92% on the day. NMDC Ltd is up 21.55% in last one year as compared to a 3.13% drop in NIFTY and a 41.29% drop in the Nifty Metal index. The PE of the stock is 9.94 based on TTM earnings ending June 26.

    NMDC's iron ore production rose to 4.06 MT in July, sales up to 3.46 MT

    1 Aug 2026

    NMDC Limited announced provisional production and sales figures for iron ore for the month and period ending July 2026, reporting a total monthly production of 4.06 MT and sales of 3.46 MT, compared to 3.09 MT and 3.40 MT, respectively, in the previous month. Cumulatively, the company’s production reached 19.16 MT and sales totaled 15.15 MT for the period up to July 2026, against 15.09 MT and 14.98 MT for the same period last year. Production from Chhattisgarh amounted to 2.55 MT and 13.78 MT cumulatively, while Karnataka contributed 1.51 MT and 5.38 MT respectively. The detailed information is also available on the company's website.

    NMDC drops after lowering iron ore prices for July'26

    13 Jul 2026

    NMDC declined 1.78% to Rs 83.37 after the company reduced the prices of Baila Lump and Baila Fines with effect from 10 July 2026.

    The state-owned miner cut the price of Baila Lump (65.5%, 10-40 mm) by Rs 250 per tonne to Rs 5,450 per tonne in July'26 from Rs 5,700 per tonne in June'26. It also reduced the price of Baila Fines (64%, -10 mm) by Rs 150 per tonne to Rs 4,700 per tonne from Rs 4,850 per tonne. Meanwhile, the foreign broker said the effective price reduction, including taxes and charges, works out to Rs 310 per tonne for lumps and Rs 190 per tonne for fines. Accordingly, the revised prices, including taxes and charges, are Rs 6,745 per tonne for lump ore and Rs 5,815 per tonne for fines. The brokerage noted that the price cut was largely in line with market expectations, citing continued weakness in global iron ore prices. It said seaborne iron ore prices have softened as increased supply has coincided with weaker demand from China, putting pressure on benchmark prices. NMDC is engaged in the exploration and production of iron ore along with diamond production and the sale of sponge iron and the generation and sale of wind power. The company reported a 35.03% jump in standalone net profit to Rs 2,020.13 crore on a 60.69% jump in revenue from operations to Rs 11,173.14 crore in Q4 FY26 over Q4 FY25. Powered by Capital Market - Live News